š Renovating The New House
A photo diary
Back in Summer 2020 we took the plunge and bought this fixer-upper town house!
We loved the area with the gorgeous hills, trees and river right on our door step ā¤
But it needed some serious love! Flimsy built in wardrobes, peach porcelain, threadbare carpets, pervasive cat smell, small rooms, weird layout, and very dated decoration.
It had belonged to a lady who bought it in 1988 and retired. Iām sure it was perfect for her but definitely not for our family of four!
Making Our Changes
The first phase of the work took around 3 months and involved gutting the whole house. We started in October with an ambitious plan to move in before Christmas.
Hereās the original layout.
The Kitchen
We love to cook and bake so the kitchen was the absolute highest priority for us. Our old house had a tiny, dingy kitchen with very little surface space and so we wanted something spacious, clean and modern.
Hereās the kitchen as it was when we got the keys at the end of September 2020:
Besides the tired tiles and faded units, the room itself was pretty tiny! Luckily, right next to it was a similarly boxy dining room:
Weāve wanted a āproperā kitchen for ages, and the dining room is barely big enough for a tableā¦ so the plan is clear! Letās pull that wall out and make space for a modern kitchen diner with an island.
We consulted with a bespoke kitchen design company and got some mock-ups.
We went with a handle-less design in charcoal grey with an island unit topped with white quartz composite and wood laminate surfaces and shelves. We also got a ton of storage built into the island itself as well as some massive pull out larder cupboards and space for a double fridge-freezer.
Time to get to work
We pulled out the stud wall between the kitchen and the dining room. Also there was a corridor with a cloakroom toilet tucked in the corner so we pulled all that out as well to get a bit more kitchen space. We also pulled out the old units and cooker, moved the conservatory door and widened the doorway leading to the living room.
Immediately we felt nervous and excited ā weād bought a house and now (for the time being) weād made it totally uninhabitable. No pressure but we need to get it right!
While the kitchen was being built we also had to ensure the new boiler was fitted, plumbing and electrics done and re-plastering. Everything had to be in place for our designated fitting week.
Fitting week came and the kitchen team came down and began fitting units, getting the oven, sink and dishwasher installed. Weirdly, the room felt bigger once it had the units in!
Once the bulk of the kitchen was installed, it started to feel like it was becoming a house again.
Meanwhileā¦
As well as all the kitchen, we had the living room, bedrooms and bathroom still to do!
We stripped out the carpets and wallpaper and ripped out the peach porcelain.
We also took out the old gas fireplace in the living room, ripped out all that flimsy built-in storage, knocked a wall down between the master bedroom and a puzzlingly tiny ādressing roomā. We also made the bathroom bigger so we could fit a large free-standing bath š
Carpets and Moving In
Once the plastering was done and the skirting boards went on, it was time to get the carpets and floors installed.
At this point we hadnāt started the garage conversion but we were pretty much ready to move in!
The Garage Conversion
Once we were in, we had a break to settle and gave some thought to the layout of our garage conversion. The garage was the size of the whole floor-plan of the house so we had a lot of options.
We decided to put a new living room at the front (replacing the garage doors with french windows), a utility/storage room to the side, a shower room at the back, and a small office/study room on the other side.
Meanwhile through the Winter I was holed up in the conservatory as my temporary office.
The Finished House
In July, around 10 months after getting the keys, we were finally finished!
In the end we replaced the floor in the kitchen with the same wooden laminate we used in the garage ā the vinyl tile floor we had installed originally was really poor and started to warp and bubble almost immediately!
The Kitchen & Living Room
The Bathroom and Bedrooms
The Garage Conversion
Phew!
So here we are almost a year later and weāre all done. There were times in the process we wondered whether weād ever get the place liveable but it was so worth it ā now we have the house exactly as we want it š